This is the old Lowcountry Digital Library.
Please visit our NEW WEBSITE HERE http://lcdl.library.cofc.edu for all of this content and more!

Photographic Record of the Cooper River Bridge

 Sort by: Title Description
1.
vol2_p098
vol2_p098 Unnumbered Image (5" x 7"): "The Cooper River Bridge from the Mt. Pleasant Shore. This photo taken by the Bridge Company for advertising purposes, and published thru the Associated Press. (Taken about July 7, '29.) Photo by Jacobs."
2.
vol1_p004
vol1_p004 Image #4 (4.5" x 2.75"): "11-15-28. High Boom! Minimum reach with main falls is about 5 ft. Note the slack backstays. Weight of traveler complete = 122 tons, including 31 ton; 150 HP gas. engine on the upper deck and 60 HP aux. gas hoist on platform below."; Unnumbered Image (5" x 7"): "Span traveler A erecting on the Charleston or West Approach. Rear boom of traveler not yet erected."
3.
vol1_p005
vol1_p005 Image #5 (4.5" x 2.75"): "11-15-28. Front view of Span Traveler on the Charleston Approach."; Unnumbered Image (5" x 7"): "Erecting steel viaduct bent at 97 ft. reach."
4.
vol1_p006
vol1_p006 Unnumbered Image (5" x 7"): "Unloading girders from R.R. cars and loading onto trucks on top of viaduct, to be pushed out to traveler by an 8 ton gasoline locomotive (extreme left.) Max-load handled = 97 ft. girder weighing 16 tons up 6% grade. Stiffleg derrick S.O. H383 - Capacity 30 tons. 70 ft. boom."; Image #6 (4.5" x 2.75"): "11-15-28. Rear view of Span Traveler on West Appr. 8 ton Vulcan gasoline locomotive in foreground."
5.
vol1_p022
vol1_p022 Unnumbered Image (5" x 7"): "1-28-29. West Anchor arm of the Town Creek Span and east end of the Charleston Approach Viaduct. Anchor arm is 256 ft. long (8 panels at 32 ft.). Stair tower at left."; Image #66 (4.5" x 2.75"): "1-30-29. Main bearing shoe, Pier 2, Town Creek Span. 5' 0" x 5' 9" = 28.75 [square feet]. Des. Load = 1,813,000# = 438 # [per square inch]. Erec. Load = 1,089,000# max. (suspended span cantilevered to center). Lower shoe 3' 4" high."
6.
vol2_p097
vol2_p097 Unnumbered Image (5" x 7"): "Looking northwest to north. Cooper River on right. Photo by Melchers."
7.
vol2_p095
vol2_p095 Unnumbered Image (5" x 7"): "From the Mt. Pleasant shore, but further back. East Approach and the Cooper River Span on the right. Photo by Melchers."
8.
vol2_p093
vol2_p093 Unnumbered Image (5" x 7"): "From the Francis Marion Hotel, overlooking the old Citadel Square. Photo by Melchers."
9.
vol2_p003
vol2_p003 Unnumbered Image (5" x 7"): "Progress in Cooper River, May 3, 1929 at 4:30 P.M. East Approach (right) complete except two spans."
10.
vol2_p006
vol2_p006 Unnumbered Image (5" x 7"): "Airplane view of the Cooper River Bridge - looking east. May 9, 1929. West approach, in foreground, completely paved. Town Creek in foreground, then Drum Island, Cooper River, and Mt. Pleasant. Charleston in lower right."
11.
vol2_p009
vol2_p009 Unnumbered Image (5" x 7"): "Progress in Cooper River, May 10, 1929, at 4:30 P.M. East viaduct (right) has been completed and viaduct traveler removed."
12.
vol2_p030
vol2_p030 Unnumbered Image (5" x 7'): "Progress in Cooper River, May 31, 1929 at 4:30 P.M. Lost 3 days since May 24 on account of lack of steel."
13.
vol2_p037
vol2_p037 Unnumbered Image (5" x 7"): "Progress on Cooper River Span, June 7, 1929 at 4:30 P.M."
14.
vol2_p012
vol2_p012 Unnumbered Image (5" x 7"): "Progress - Cooper River Span, May 17, 1929 at 4:30 P.M."
15.
vol2_p048
vol2_p048 Unnumbered Image (5" x 7"): "Progress, Cooper River Span, June 14, 1929 at 4:30 P.M."
16.
vol2_p094
vol2_p094 Unnumbered Image (5" x 7"): "Taken from the wreck of an old steamer, near the entrance to the Mt. Pleasant ferry slip."
17.
vol2_p096
vol2_p096 Unnumbered Image (5" x 7"): "The most unique of all bridge pictures, showing North side of Cooper River Span, in the foreground, and the South side of the Town Creek Span, beneath it, in the distance."
18.
vol2_p060
vol2_p060 Unnumbered Image (5" x 7"): "Progress - Cooper River Span, June 21, 1929 at 4:30 P.M. First closing bottom chord in place."
19.
vol2_p067
vol2_p067 Unnumbered Image (5" x 7"): "Progress - Cooper River Span, June 28, 1929 at 4:30 P.M. Suspended span ready to be freed from its cantilever condition and swung as a simple truss span, which was done on Sat., June 29, 1929, starting at 8 A.M. and being completed at 3: P.M."
20.
vol2_p071
vol2_p071 Unnumbered Image (5" x 7"): "1050' Cooper River Span - July 2, 1929. Suspended span swung as a simple span and jacking chords at U17 removed for replacement by dummy chords."