Lowcountry Digital Library © 2009 Lowcountry Digital Librarypowered by CONTENTdm®

preferenceshelpabout uscontact us
homebrowseadvanced search my favorites
 

Refine Search

Subject
Bridges -- South Carol... (41)

Date
ca 1929 (6)
1928-11-15 (2)
1929-03-22 (2)
1929-03-29 (2)
1928-11-15 - 1928-11-2... (1)
Show more...

This is the old Lowcountry Digital Library.
Please visit our NEW WEBSITE HERE http://lcdl.library.cofc.edu for all of this content and more!

Photographic Record of the Cooper River Bridge

 Sort by: Title Description
21.
vol1_p037
vol1_p037 Unnumbered Image (5" x 7"): "Progress Feb. 22, 1929 at 4:30 P.M."
22.
vol1_p046
vol1_p046 Unnumbered Image (5" x 7"): "Progress March , 1929 at 4:30 P.M. Town Creek Span and Drum Island Viaduct."
23.
vol1_p052
vol1_p052 Unnumbered Image (5" x 7"): Progress March 8, 1929 at 4:30 P.M. West (left) half of Town Creek Span completed and traveler being dismantled. Viaduct traveler erecting span 17D. East cantilever arm complete."
24.
vol1_p054
vol1_p054 Image #150 (2.75" x 4.5"): "Erecting east half of suspended span - Town Creek."; Image #152 (2.75" x 4.5"): "3-13-29. Progress in Town Creek - getting nearer!"; Image #151 (2.75" x 4.5"): "3-11-29. West cantilever as seen from below. This photo suggested by C.D. Marshall."
25.
vol1_p058
vol1_p058 Unnumbered image (5" x 7"): Progress March 15, 1929 at 4:30 P.M. Town Creek Span - Drum Island Viaduct."
26.
vol1_p064
vol1_p064 Unnumbered Image (5" x 7"): "Progress at 4 P.M., March 22, 1929. Town Creek Span - Drum Island Viaduct."
27.
vol1_p066
vol1_p066 Unnumbered Image (5" x 7"): "Lowering 33 ton, 150 HP Gasoline hoisting engine, under its own power. Town Creek Span. Ridden down by W.E. Omohundro, Sup't., W.S. Patterson, Pusher, and John Shelton, Engineman."
28.
vol1_p070
vol1_p070 Unnumbered Image (5" x 7"): "Progress, March 29, 1929 at 4:30 P.M. Town Creek Span complete except riveting and travelers removed."
29.
vol1_p072
vol1_p072 Unnumbered Image (5" x 7"): "Progress in Cooper River, March 29, 1929 at 4:30 P.M. Drum Island Viaduct (left) just completed. Span Traveler A (right) re-erected. Drum Island Viaduct / Pier 5 / 270' Deck Span / Pier 6 / 270' Deck Span / Pier 7 / 450' Anchor Arm / Pier 8 / 1050' Main Span (Cantilevers & Suspended Span) / Pier 9 / 450' Anchor Arm / Pier 10 / 270' / Pier 11 / 270' / Pier 12 / 270' / Pier 13 / East Approach Viaduct."
30.
vol1_p075
vol1_p075 Unnumbered Image (5" x 7"): "Progress, April 5, 1929 at 4:30 P.M."
31.
vol1_p084
vol1_p084 Unnumbered Image (5" x 7"): "Progress, April 12, 1929 at 4:30 P.M."
32.
vol1_p085
vol1_p085 Unnumbered Image (5" x 7"): "Progress, April 19, 1929 at 4:30 P.M. Note east end of East Approach (extreme right) under erection by C.E. Hillyer."
33.
vol1_p094
vol1_p094 Unnumbered Image (5" x 7"): "Progress in Cooper River, April 26, 1929 at 4:30 P.M. material tower at Pier 13 (right) is erecting viaduct traveler 'C' to complete the east Approach."
34.
vol2_p060
vol2_p060 Unnumbered Image (5" x 7"): "Progress - Cooper River Span, June 21, 1929 at 4:30 P.M. First closing bottom chord in place."
35.
vol2_p067
vol2_p067 Unnumbered Image (5" x 7"): "Progress - Cooper River Span, June 28, 1929 at 4:30 P.M. Suspended span ready to be freed from its cantilever condition and swung as a simple truss span, which was done on Sat., June 29, 1929, starting at 8 A.M. and being completed at 3: P.M."
36.
vol2_p071
vol2_p071 Unnumbered Image (5" x 7"): "1050' Cooper River Span - July 2, 1929. Suspended span swung as a simple span and jacking chords at U17 removed for replacement by dummy chords."
37.
vol2_p072
vol2_p072 Unnumbered Image (5" x 7"): "From the Mt. Pleasant shore, looking toward Charleston, East Approach and Cooper River Span at right. Town Creek Span in the distance. (About July 2, 1929)."
38.
vol2_p084
vol2_p084 Image #549 (2.75" x 4.5"): "7-23-29. 12 x 12 Timber caps and blocking removed from the falsework bents."; Image #550 (4.5" x 2.75"): "7-25-29. Sling used for pulling piles - six parts of 1 1/4" [diameter] wire cable with overhauling ball at lower end. Photo shows sling just placed around pile, before taking any strain."; Image #522 (2.75" x 4.5"): "7-25-29. Office force and timekeepers. E. Neufer, E.L.D., W.R. Drake, Roberts, Bacot, D.W. Graham, Frank."
39.
vol2_p021
vol2_p021 Unnumbered Image (5" x 7"): "Progress in Cooper River, May 24, 1929 at 5: P.M. Both travelers are tied up for lack of steel. Traveler A (right) held at L8 on account of shop error in joint at L10. Traveler B (left) has moved to L9. Note U.S. Navy destroyers."
40.
vol2_p099
vol2_p099 Unnumbered Image (5" x 7"): "Same view as on preceding page, but further back, showing part of East Approach. Photos by Melcher."