Lowcountry Digital Library © 2009 Lowcountry Digital Librarypowered by CONTENTdm®

preferenceshelpabout uscontact us
homebrowseadvanced search my favorites
 

Refine Search

Subject
Bridges -- South Carol... (53)

Date
ca 1929 (8)
1928-11-15 (3)
1929-06-21 (2)
1929-05-03 (2)
1929-03-22 (2)
Show more...

This is the old Lowcountry Digital Library.
Please visit our NEW WEBSITE HERE http://lcdl.library.cofc.edu for all of this content and more!

Photographic Record of the Cooper River Bridge

 Sort by: Title Description
21.
vol2_p072
vol2_p072 Unnumbered Image (5" x 7"): "From the Mt. Pleasant shore, looking toward Charleston, East Approach and Cooper River Span at right. Town Creek Span in the distance. (About July 2, 1929)."
22.
vol2_p016
vol2_p016 Image #336 (2.75" x 4.5"): "5-18-29. Office in A.C.L. Yard. See also #1."; Image #337 (2.75" x 4.5"): "Bottom chord joint at L10 - over main piers 8 and 9. Weight 13 tons. 12'-7" long x 12'-4" high (Main gas. pl. 108" x 1" x 12'-7")."; Image #338 (4.5" x 2.75"): "5-21-29. West anchor arm landing on Pier 8."
23.
vol2_p009
vol2_p009 Unnumbered Image (5" x 7"): "Progress in Cooper River, May 10, 1929, at 4:30 P.M. East viaduct (right) has been completed and viaduct traveler removed."
24.
vol2_p019
vol2_p019 Image #346 (4.5" x 2.75"): " 5-22-29. East anchor arm just before erecting the joints at L10 on Pier 8. (See also 343, 344, 345, & 348)."; Image #347 (4.5" x 2.75"): "Traveler on floorbeam at L8, Span 7, from Pier 8."; Image #349 (4.5" x 2.75"): "5-23-29. Main bearing shoe, Pier 9. Anchor arm trusses not yet pulled back to connect to top shoe. See pulling and jacking devices, 350 and 351. 7'-3 x 8'-6 = 61.6 [square feet]. Max. Des. Load = 3,916,000 [pounds] = 63,540 [pounds/square feet] = 440 [pounds/square inch]. Max. Erec. Load = 2,658,000 [pounds] with suspended span cantilevered to center."
25.
vol2_p021
vol2_p021 Unnumbered Image (5" x 7"): "Progress in Cooper River, May 24, 1929 at 5: P.M. Both travelers are tied up for lack of steel. Traveler A (right) held at L8 on account of shop error in joint at L10. Traveler B (left) has moved to L9. Note U.S. Navy destroyers."
26.
vol2_p099
vol2_p099 Unnumbered Image (5" x 7"): "Same view as on preceding page, but further back, showing part of East Approach. Photos by Melcher."
27.
vol2_p030
vol2_p030 Unnumbered Image (5" x 7'): "Progress in Cooper River, May 31, 1929 at 4:30 P.M. Lost 3 days since May 24 on account of lack of steel."
28.
vol2_p093
vol2_p093 Unnumbered Image (5" x 7"): "From the Francis Marion Hotel, overlooking the old Citadel Square. Photo by Melchers."
29.
vol2_p094
vol2_p094 Unnumbered Image (5" x 7"): "Taken from the wreck of an old steamer, near the entrance to the Mt. Pleasant ferry slip."
30.
vol2_p095
vol2_p095 Unnumbered Image (5" x 7"): "From the Mt. Pleasant shore, but further back. East Approach and the Cooper River Span on the right. Photo by Melchers."
31.
vol2_p096
vol2_p096 Unnumbered Image (5" x 7"): "The most unique of all bridge pictures, showing North side of Cooper River Span, in the foreground, and the South side of the Town Creek Span, beneath it, in the distance."
32.
vol2_p097
vol2_p097 Unnumbered Image (5" x 7"): "Looking northwest to north. Cooper River on right. Photo by Melchers."
33.
vol1_p064
vol1_p064 Unnumbered Image (5" x 7"): "Progress at 4 P.M., March 22, 1929. Town Creek Span - Drum Island Viaduct."
34.
vol1_p066
vol1_p066 Unnumbered Image (5" x 7"): "Lowering 33 ton, 150 HP Gasoline hoisting engine, under its own power. Town Creek Span. Ridden down by W.E. Omohundro, Sup't., W.S. Patterson, Pusher, and John Shelton, Engineman."
35.
vol1_p070
vol1_p070 Unnumbered Image (5" x 7"): "Progress, March 29, 1929 at 4:30 P.M. Town Creek Span complete except riveting and travelers removed."
36.
vol1_p075
vol1_p075 Unnumbered Image (5" x 7"): "Progress, April 5, 1929 at 4:30 P.M."
37.
vol1_p022
vol1_p022 Unnumbered Image (5" x 7"): "1-28-29. West Anchor arm of the Town Creek Span and east end of the Charleston Approach Viaduct. Anchor arm is 256 ft. long (8 panels at 32 ft.). Stair tower at left."; Image #66 (4.5" x 2.75"): "1-30-29. Main bearing shoe, Pier 2, Town Creek Span. 5' 0" x 5' 9" = 28.75 [square feet]. Des. Load = 1,813,000# = 438 # [per square inch]. Erec. Load = 1,089,000# max. (suspended span cantilevered to center). Lower shoe 3' 4" high."
38.
vol1_p084
vol1_p084 Unnumbered Image (5" x 7"): "Progress, April 12, 1929 at 4:30 P.M."
39.
vol1_p085
vol1_p085 Unnumbered Image (5" x 7"): "Progress, April 19, 1929 at 4:30 P.M. Note east end of East Approach (extreme right) under erection by C.E. Hillyer."
40.
vol1_p094
vol1_p094 Unnumbered Image (5" x 7"): "Progress in Cooper River, April 26, 1929 at 4:30 P.M. material tower at Pier 13 (right) is erecting viaduct traveler 'C' to complete the east Approach."