Image #360 (2.75" x 4.5"): "5-28-29. rolling top chord U8 U10 - 100 ft. long Wt. 36 tons."; Image #361 (2.75" x 4.5"): "5-28-29. U8 U10 being rolled right side up for erection. Note special rolling slings & sheaves."; Image #362 (2.75" x 4.5"): "5-28-29. Loading U8 U10 on truck to be run out and loaded on lighter."; Image #363 (2.75" x 4.5"): "5-28-29. Loading U8 U10 on lighter."
Image #364 (2.75" x 4.5"): "5-28-29. East anchor arm (left) - Town Creek Span in distance and west anchor arm (right)."; Image #365 (2.75" x 4.5"): "5-29-29. Town Creek Span & west anchor arm of Cooper River Span with U8 U10 just erected."; Image #366 (2.75" x 4.5"): "5-29-29. Erecting top chord U8 U10. Span 9. (Patterson)."; Image #367 (2.75" x 4.5"): "5-29-29. Erecting U8 U10. Span 9."
Image #368 (2.75" x 4.5"): "5-28-29. Erecting U8 U10. Span 9."; Image #369 (2.75" x 4.5"): "5-29-29. Top chord U8 U10 in place. Span 7."; Image #370 (2.75" x 4.5"): "5-29-29. fitting up joint at U8. Span 7."; Image #371 (2.75" x 4.5"): "5-29-29. Hitch plates and connection to U8 U10 for erection. Span 7."