Lowcountry Digital Library © 2009 Lowcountry Digital Librarypowered by CONTENTdm®

preferenceshelpabout uscontact us
homebrowseadvanced search my favorites
 

Refine Search

Subject
Bridges -- South Carol... (2)

Date
1929-05-09 - 1929-05-1... (1)
1929-05-10 (1)

This is the old Lowcountry Digital Library.
Please visit our NEW WEBSITE HERE http://lcdl.library.cofc.edu for all of this content and more!

Photographic Record of the Cooper River Bridge

 Sort by: Title Description
1.
vol2_p008
vol2_p008 Image #308 (2.75" x 4.5"): "5-9-29. Progress at noon."; Image #309 (2.75" x 4.5"): "5-9-29. Falsework bent #29, L6 - west anchor arm. Low tide, 25 ft. of water. 16 plumb piles & 8 batter piles under each column. Max. load = 20 1/2 tons per pile."; Image #310 (2.75" x 4.5"): "5-10-29. Traveler A, east side, at L4."; Image #311 (2.75" x 4.5"): " 5-10-29. Looking west from traveler on Cooper River Span, west anchor arm."
2.
vol2_p009
vol2_p009 Unnumbered Image (5" x 7"): "Progress in Cooper River, May 10, 1929, at 4:30 P.M. East viaduct (right) has been completed and viaduct traveler removed."