Photographic Record of the Cooper River Bridge

 Sort by: Title ▲ Description
1.
vol2_p092
vol2_p092
2.
vol1_p001
vol1_p001 A Photographic Record of the Construction of the Cooper River Bridge; Charleston, South Carolina - 1928-29; Volume I; Showing the erection of the West or Charleston approach, the Town Creek Cantilever Span, the Drum Island Viaduct, and the Deck Truss Spans in the Cooper River. Steel for viaducts furnished by the Virginia Bridge & Iron Co. Steel for truss spans furnished by McClintic-Marshall Co. All steel erected by McClintic-Marshall Co., Pottstown Erection Dep't. Small photos by E.L. Durkee. 5" x 7" Photos by James Smyth ("Irish").
3.
vol2_p001
vol2_p001 A Photographic Record of the Construction of the Cooper River Bridge; Charleston, South Carolina - 1928-29; Volume II; Showing the erection of the Cooper River Cantilever Span, 1050 feet center to center of main piers, and being at the time of its completion the fifth longest cantilever, or truss span of any kind in the world. Steel furnished by McClintic-Marshall Co. and erected by the Pottstown Erection Dep't. Small photos by E.L. Durkee. 5" x 7" Photos by James Smyth ("Irish"). Larger photos as noted.
4.
vol1_cover
vol1_cover Cooper River Bridge, Vol. 1, 1928 - 1929, Record By E.L. Durkee, Property of Beth Steel Co., Eastern District
5.
vol2_cover
vol2_cover Cooper River Bridge, Vol. 2, 1928 - 1929, Record By E.L. Durkee, Property of Beth Steel Co., Eastern District
6.
vol2_p075
vol2_p075 Image #518 (4.5" x 2.75"): "7-4-29."; Image #519 (4.5" x 2.75"): "7-4-29."; Image #520 (4.5" x 2.75"): "7-4-29."; "Three views showing conditions at time of R.H. McKnight's death. He was knocked from the top chord of the suspended span and fell to the deck below, July 3, 1929 at 10:45 A.M."
7.
vol2_p082
vol2_p082 Image #542 (4.5" x 2.75"): "7-17-29. Pouring the next to the last section of the concrete deck. Only 3 more panels to go - about 131 ft. Last section of concrete deck poured July 20, 1929, and last section of curb on July21."; Image #543 (2.75" x 4.5"): "7-21-29. C.E. Hillyers' concrete plant at the end of the West Approach. Concrete hauled 6700 ft. to center of Cooper River."; Image #544 (2.75" x 4.5"): "7-21-29. Reinforcing bar bending machine."
8.
vol1_p027
vol1_p027 Image #76 (2.75" x 4.5"): Temporary top chord links between U13 and U14, carrying diaphragms for hydraulic jacks - Town Creek Span."; Image #77 (2.75" x 4.5"): "End view of links shown in #76."; Image #78 (2.75" x 4.5): "End view of top chords U12 U13 at U13. (see #87)."
9.
vol2_p093
vol2_p093 Unnumbered Image (5" x 7"): "From the Francis Marion Hotel, overlooking the old Citadel Square. Photo by Melchers."
10.
vol2_p095
vol2_p095 Unnumbered Image (5" x 7"): "From the Mt. Pleasant shore, but further back. East Approach and the Cooper River Span on the right. Photo by Melchers."
11.
vol2_p072
vol2_p072 Unnumbered Image (5" x 7"): "From the Mt. Pleasant shore, looking toward Charleston, East Approach and Cooper River Span at right. Town Creek Span in the distance. (About July 2, 1929)."
12.
vol2_p097
vol2_p097 Unnumbered Image (5" x 7"): "Looking northwest to north. Cooper River on right. Photo by Melchers."
13.
vol2_p060
vol2_p060 Unnumbered Image (5" x 7"): "Progress - Cooper River Span, June 21, 1929 at 4:30 P.M. First closing bottom chord in place."
14.
vol2_p067
vol2_p067 Unnumbered Image (5" x 7"): "Progress - Cooper River Span, June 28, 1929 at 4:30 P.M. Suspended span ready to be freed from its cantilever condition and swung as a simple truss span, which was done on Sat., June 29, 1929, starting at 8 A.M. and being completed at 3: P.M."
15.
vol2_p012
vol2_p012 Unnumbered Image (5" x 7"): "Progress - Cooper River Span, May 17, 1929 at 4:30 P.M."
16.
vol1_p028
vol1_p028 Unnumbered Image (5" x 7"): "Progress - Town Creek Span & Drum Island Viaduct. Feb. 1, 1929 at 4:30 P.M."
17.
vol1_p037
vol1_p037 Unnumbered Image (5" x 7"): "Progress Feb. 22, 1929 at 4:30 P.M."
18.
vol1_p031
vol1_p031 Unnumbered Image (5" x 7"): "Progress. Feb. 8, 1929 at 4:30 P.M."
19.
vol1_p094
vol1_p094 Unnumbered Image (5" x 7"): "Progress in Cooper River, April 26, 1929 at 4:30 P.M. material tower at Pier 13 (right) is erecting viaduct traveler 'C' to complete the east Approach."
20.
vol1_p072
vol1_p072 Unnumbered Image (5" x 7"): "Progress in Cooper River, March 29, 1929 at 4:30 P.M. Drum Island Viaduct (left) just completed. Span Traveler A (right) re-erected. Drum Island Viaduct / Pier 5 / 270' Deck Span / Pier 6 / 270' Deck Span / Pier 7 / 450' Anchor Arm / Pier 8 / 1050' Main Span (Cantilevers & Suspended Span) / Pier 9 / 450' Anchor Arm / Pier 10 / 270' / Pier 11 / 270' / Pier 12 / 270' / Pier 13 / East Approach Viaduct."