© 2009
Lowcountry Digital Library
•
powered by CONTENTdm
®
preferences
•
help
•
about us
•
contact us
home
•
browse
•
advanced search
•
my favorites
5
>
1929-03-29
Refine Search
Subject
Bridges -- South Carol...
(3)
Photographic Record of the Cooper River Bridge
select all items
•
clear all items
•
+ add to favorites
results
1
-
3
of
3
{ page 1 of 1 }
«
1
»
previous
:
next
Sort by:
Title
Description
1.
preview
vol1_p070
Unnumbered Image (5" x 7"): "Progress, March 29, 1929 at 4:30 P.M. Town Creek Span complete except riveting and travelers removed."
2.
preview
vol1_p072
Unnumbered Image (5" x 7"): "Progress in Cooper River, March 29, 1929 at 4:30 P.M. Drum Island Viaduct (left) just completed. Span Traveler A (right) re-erected. Drum Island Viaduct / Pier 5 / 270' Deck Span / Pier 6 / 270' Deck Span / Pier 7 / 450' Anchor Arm / Pier 8 / 1050' Main Span (Cantilevers & Suspended Span) / Pier 9 / 450' Anchor Arm / Pier 10 / 270' / Pier 11 / 270' / Pier 12 / 270' / Pier 13 / East Approach Viaduct."
3.
preview
vol1_p073
Image #200 (4.5" x 2.75"): "Elev. 165' / 45' A-frame / 40' Traveler Trusses / 40' Deck Truss Span / 40' Flswk. Bent / Elev. 0.0 / Low Water. 3-29-29. Falsework columns are 19'-6" canters. Deck span trusses and traveler trusses are 18'-0" centers. Deck Span 12 at Pier 13."; Image #202 (4.5" x 2.75"): "4-3-29. Deck span 12 under erection. Pier 13."; Image #203 (4.5" x 2.75"): "4-3-29. First panel of deck span 5 erected by viaduct traveler, and latter is erecting Span Traveler B, the lower deck of which is complete."
select all items
•
clear all items
•
+ add to favorites
results
1
-
3
of
3
{ page 1 of 1 }
«
1
»
previous
:
next