Writing on bottom states, "1648-42 US Navy Yard, SC. October 30, 1942. Contract NOy-4217 South and West Elevations of Power Plant, showing (left to right) New coal handling facilities, ash handling and locomotive charging station. File 13660."
Writing on bottom states, "1584-41 US Navy Yard, Charleston, SC. October 28, 1941. USS Tillman (DD 641) Bow Assembly total weight 47,780 pounds exclusive of rigging, showing method used for handling stem from ground and transporting bt crane to Building Ways level. The Assembly was lowered to Ways level and transferred to the cranes on the north side. File 11063."
Writing on bottom states, "1582-41 US Navy Yard, Charleston, SC. October 28, 1941. USS Tillman (DD 641) Total weight 47,780 pounds exclusive of rigging, showing method of raising Bow Assembly to vertical position preparatory to hoisting into position on ship. File 11061."
Writing on bottom states, "157-43 US Navy Yard, SC. January 11, 1943. Launching of the USS LST 359 and 360 from Building Ways 342 and 342C. Respectively. View of Sponsor's platform immedietly after releasing LST 360. File 14716."
Writing on bottom states, "157-43 US Navy Yard, SC. January 11, 1943. Group picture of LST Sub-Contractor Representatives taken with Sponsors and Maid and Matron of Honor. (Names follow) File 14724."
Writing on bottom states, "157-43 US Navy Yard, SC. January 11, 1943. Launching of the USS LST 359 and 360 from Building Ways 342 and 342C, Respectively, January 11, 1943. Stern view of LST 359 and 360. Picture taken just prior to launching, January 11, 1943. File 14736."
Writing on bottom states, "156-43 US Navy Yard, SC. January 11, 1943. Group picture of Representatives of the Planning Section and the Sub-contracting Firms for the LST program. (Names follow) File 14735."
Writing on bottom states, "1456-41 US Navy Yard, Charleston, SC. September 26, 1941. Stern Assembly for USS Tillman (DD 641) Being raised to position over top of stage bents, at Bow in preparation of trolleyed over ship to position at Stern. File 11031."
Writing on bottom states, "1455-41 US Navy Yard, Charleston, SC. September 26, 1941. Stern Assembly for USS Tillman (DD 641) Nearing position at Stern of ship. File 11033."
Writing on bottom states, "1455-41 US Navy Yard, Charleston, SC. September 26, 1941. Stern Assembly for USS Tillman (DD 641) Total weight 58,560 pounds. Stern complete to Bulkhead no. 183. View shows Stern passing over Crane Structure. File 11030."
Writing on bottom states, "1436-41 US Navy Yard, Charleston, SC. September 22, 1941. USS Beatty (DD 640) Stern assembly nearing position at stern. File 11727."
Writing on bottom states, "1431-41 US Navy Yard, Charleston, SC. September 22, 1941. USS Beatty (DD 640) Starboard broadside view of stern assembly loaded on flat car for transportation to building ways. Stern complete to bulkhead no. 183. File 11724."
Writing on bottom states, "1431-41 US Navy Yard, Charleston, SC. September 22, 1941. USS Beatty (DD 640) Stern view of the stern assembly showing method of securing aft on flat car for transportation to building ways. File 11722."
Writing on bottom states, "1383-42 US Navy Yard, SC. September 7, 1942. keel laying ceremonies of the LST 356, Monday, Labor Day, September 7, 1942. (names follow) File 14155."
Writing on bottom states, "1381-42 US Navy Yard, SC. September 7, 1942. Admiral W. Glassford presenting Mr. and Mrs. Moses B. Hayes with a plaque commemorating the keel laying of the LST 356, Monday, Labor Day, September 7, 1942. 14153."
Writing on bottom states, "1374-42 US Navy Yard, SC. September 7, 1942. Keel laying ceremonies of the LST 355, Labor Day, Monday, September 7, 1942. (names follow) File 14146."